Central Arizona Project (CAP) – A long time coming and coming a long way!
The history of Arizona’s most precious resource, water is fascinating. For example, after forming the Colorado River Compact, Arizona held out for 22 years from 1922 to 1944, in a dispute for it’s portion of the 7.5 million acre feet to be divided between Arizona, California and Nevada (the Lower Basin states). It took another 22 years to lobby congress to approve the Central Arizona Project(CAP), and 20 years to complete the construction of the canal which runs 336 miles from Lake Havasu to Phoenix and down to Tucson. It was declared substantially complete in 1993, over 70 years in the making at a cost of almost $4 billion.